Home / Services / 4D Construction Scheduling

4D construction scheduling and visualization

Schedule activities linked to 3D model objects, so the construction sequence can be played, paused at any data date and questioned. Select an activity to find its geometry, or an object to find its activities.

Screenshot of the Interactive P6 Schedule demonstration
The Interactive P6 Schedule demonstration on synthetic data. Open it live.

Problems this solves

What the work covers

Schedule-linked models

Every modeled object carries an Activity ID, so levels, disciplines and packages can be shown or hidden by schedule status.

Baseline and update comparison

The model shown at any date as the original baseline (BL), the previous update (BL1) or the current update (BL2), with a compare mode that marks work less built than the compared snapshot planned.

Sequencing reviews

The planned order of work played against the data date for constructability and access reviews.

Rendered 4D videos

A narrated or captioned sequence of weekly updates for meetings and progress reports.

Update refresh

The model rebuilt from each new update, so the visual always matches the reported dates.

Typical deliverables

Models are for planning and communication, not engineering design. The demonstrations use a fictional facility and a synthetic schedule.

How the work runs

  1. Agree the model scope. Which areas, levels and objects the model needs for the decisions in question.
  2. Link objects to activities. Each object tagged with the Activity IDs that build it.
  3. Review the sequence. The build played against the data date with the planners and construction team.
  4. Refresh with each update. The model and any rendered sequence rebuilt from the new schedule.

See a working demonstration

Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.

Watch it working

A narrated tour of a fictional gas processing train built from a synthetic P6 schedule: one date shown as the original baseline, the previous update and the current update, with compare mode marking the compressor packages that are less built than last period planned. Fictional project, synthetic data.

Read the transcript

This is a fictional gas processing train, linked to a synthetic Primavera P6 schedule, presented by McKowen Project Controls.

Every object in the model is tied to a P6 activity. As the date advances, piling, foundations, the pipe rack, equipment and piping appear in the order the current update forecasts. Gray is installed, amber is being installed, and work that has not started yet stays hidden.

Past the data date of seventeen November, the model follows the forecast. The residue gas compression area is where this update changed the most.

Here is one date, the twenty-fifth of March twenty twenty-seven, in three snapshots. In the original baseline, BL, the compressor packages are almost set. In the previous update, BL1, they finish five working days later. In the current update, BL2, they have not started: their finish is fifteen working days behind the baseline, and ten later than last period.

Compare mode turns that difference into geometry. Violet marks work that is less complete in this update than the previous one planned for the same date: the compressor packages, and the instrument installation that moved with them. The driver is the compressor delivery, which now arrives ten working days later than last period.

Played forward, the current update reaches mechanical completion on the eighteenth of August, and ready for start-up on the twenty-ninth of September twenty twenty-seven, twelve working days behind the baseline.

Your data, your requirements, your reporting solution.

A second example

Ninety seconds of a fictional topside module built in a fabrication hall against a synthetic schedule, shown as a sequence of weekly updates with the data-date line. Fictional project, synthetic data.

What the video shows

Ninety seconds of a fictional topside module built in a fabrication hall against a synthetic schedule, shown as a sequence of weekly updates with the data-date line. The video has no narration. Percent complete is shown in the schedule table, not inside the bars.

See it on your own schedule

A live demonstration walks through this work with you, on the reports above or on your own schedule export.

Questions clients ask

What does 4D mean here?

A 3D model whose objects are linked to P6 activities, so the model can be played through time and shown at any date.

Can the model show the baseline and the previous update?

Yes. The interactive model shows BL, BL1 or BL2 at any date, and a compare mode marks the work that is less built than the compared snapshot planned.

Are the models suitable for engineering design?

No. The models are for planning and communication, not engineering design.

Discuss your project

Every service is billed at the same hourly rate. See pricing, call 713-303-7576 or send a project request.

Related services