Primavera P6 scheduling and consulting

Primavera P6 schedules built and maintained so the logic can be followed from any milestone back to the work that drives it, and checked every update before it is reported.

Screenshot of the Interactive P6 Schedule demonstration
The Interactive P6 Schedule demonstration on synthetic data. Open it live.

Problems this solves

What the work covers

Baseline development

Activity structure, logic, durations and calendars set up with the team, with a written basis of schedule.

Update support

Weekly or monthly statusing against the data date, with validation before the update is issued.

Schedule health checks

Missing logic, open ends, constraints, high and negative float, relationship types, lags and out-of-sequence progress, each listed down to the activity.

Recovery schedules

Re-sequencing options scheduled again through the network, so the recovered dates come from the logic and not from edits to the milestones.

Typical deliverables

How the work runs

  1. Read the schedule as it is. Logic, constraints, calendars, float and progress checked against the data date before anything changes.
  2. Correct structure and logic. Missing links, open ends, hard constraints and long lags corrected with the planners who own the work.
  3. Baseline or re-baseline. The approved version stored as the original baseline (BL), kept fixed for every later comparison.
  4. Status and validate each update. Progress entered against the data date and checked before the update is issued.

See a working demonstration

Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.

See it on your own schedule

A live demonstration walks through this work with you, on the reports above or on your own schedule export.

Questions clients ask

What does a schedule health check evaluate?

Missing logic and open ends, hard constraints, high and negative float, relationship types, leads and lags, out-of-sequence progress and actual dates after the data date. Each count is listed down to the activity behind it.

What is the difference between BL, BL1 and BL2?

BL is the locked original baseline. BL1 is the previous update and BL2 the current update. Prior Period Variance is BL minus BL1, Current Period Variance is BL minus BL2, and Period-over-Period Variance is BL1 minus BL2, in working days; negative means later.

Can a recovery schedule be shown without changing the approved schedule?

Yes. Recovery options are scheduled again through the logic network as labeled scenarios, so the approved update stays as reported and each option shows the working days it returns.